TP8 – Mitigation plant
In IWTP8, a Mitigation plant was implemented in 2015 based on a MaSa Design to increase the treatment capacity by 20,000 m3/day. This Mitigation plant is...
In IWTP8, a Mitigation plant was implemented in 2015 based on a MaSa Design to increase the treatment capacity by 20,000 m3/day. This Mitigation plant is...
Commissioning of new unit Supply Potable Water Capacity of 60,000 m3/day Process water 40,000 m3/day + Potable water 20,000 m3/day = Total 60,000 m3/day for the 2 units, only export...
Commercial | 1,092 |
Government | 329 |
Industries | 79 |
Marafiq | 52 |
Residential | 21,090 |
Integrated system New technology Reliability team CPO (GIS – Modernization) CPO GIS digitization of Potable Water, Reclaimed Water and Sea Water Facility are 100% completed. GIS digitized data field survey verification is on-going with 55%...
MaSa has reached 62 % Saudization as Aug 2016 .
MaSa’s YTD actual direct hire employees is 718 of the total 1,343.
...MaSa took over Stage 5 in SWTP9 in 2014; it is an additional 72,000 m3/day treatment capacity with a biological process, anaerobic system (Digester) and sludge-dewatering unit. The two digesters...